Skip to content
GravityX
STAVANGER, NORWAY
jso@gravityx.no
EMAIL
+47 920 50 907
CALL NOW
  • Your Challenge
  • Why Norway
  • What we do
  • Insights
    • NORSOK Compliance
    • ATEX Compliance
    • DNV-ST-0378
    • DNV 2.7-1 & 2.7-3 Compliance
  • Our Clients
  • About us
    • Contact us
Fast track. One call

Tag: EX

GravityX > EX
Standards & Compliance
EX-rated industrial equipment for hazardous area applications
August 30, 2026 admin

EX Equipment — Know the Area Before You Design the Equipment

EX requirements start with the hazardous area. Understand zone classification and the applicable certification basis before selecting equipment.

Read More
Standards & Compliance
Engineering analysis supporting NORSOK, DNV and ATEX compliance
August 30, 2026 admin

Compliance according to NORSOK, DNV, ATEX and other

How NORSOK, DNV, ATEX and project-specific requirements affect engineering, fabrication, inspection and documentation before delivery.

Read More

Recent Posts

  • Desk with technical drawings and a phone showing no new messages, symbolising the wait for supplier status updates How to Handle an Unresponsive Fabrication Supplier September 4, 2026
  • Fabricated steel assembly representing fast-track engineering and NORSOK compliance Fast-Track Engineering Without Cutting Corners September 3, 2026
  • Industrial project support in Norway through one accountable point of contact Your “Go-To” Person in Norway September 1, 2026
  • NORSOK standard documentation for offshore lifting equipment requirements NORSOK R-002: Lifting Equipment Explained August 31, 2026

Categories

  • Standards & Compliance 7
  • What we do 3
  • Why Norway 3

Tags

  • 2.7-3
  • 271
  • 273
  • ATEX
  • COMPLIANCE
  • DNV
  • engineering
  • EX
  • fabrication
  • fast track
  • Material Certificate 3.1
  • NORSOK
  • Norway
  • Offshore Container

Sign Up to get Latest Updates

FAST TRACK. ONE CALL.

STAVANGER, NORWAY
+47 920 50 907
jso@gravityx.no

GRAVITYX

  • About us

Latest articles

  • Desk with technical drawings and a phone showing no new messages, symbolising the wait for supplier status updates How to Handle an Unresponsive Fabrication Supplier September 4, 2026
  • Fabricated steel assembly representing fast-track engineering and NORSOK compliance Fast-Track Engineering Without Cutting Corners September 3, 2026

Copyright © 2025 All Rights Reserved.