OFFSHORE & PLATFORM LIFTING APPLIANCES
DNV-ST-0378, From Design to Delivery
DNV-ST-0378 applies to offshore and platform lifting appliances. The practical challenge is not simply identifying the standard, but making the design basis, machinery, fabrication, verification, testing and documentation work as one project. This series looks at six different points where lifting-equipment projects commonly need early technical decisions.
Start with the lifting operation, not the certificate
A DNV-ST-0378 project can involve structural engineering, mechanical equipment, controls, fabrication, inspection and testing. The exact compliance route depends on the appliance, its intended operation and the agreed certification basis. Establishing those inputs early gives every discipline a common technical starting point.
The articles below follow the project from the first design-basis questions through load cases, machinery and controls, fabrication traceability and final testing. They are written for project teams that need to get lifting equipment engineered and delivered — not simply interpret a standard.
When the requirement has to become a delivery
GravityX can coordinate the execution around the requirement, including engineering, fabrication and compliance-driven project support. Where the schedule is critical, the aim is to resolve the technical and verification interfaces early enough to keep the work moving.
